On the ultra-high-voltage band, the tariff since 1 July 2025 is 51.18 sen/kWh peak and 47.09 sen/kWh off-peak, before fuel surcharge. An analyst projects about 66.6 sen/kWh effective if a 7.59 sen surcharge applies from January 2027; that is a projection, not the current rate. The minister has also said operators will have to pay for their full contracted capacity, with no date or rate given.

Power costs and rules
FactFigureSource
TariffUltra-high-voltage band from 1 Jul 2025: 51.18 sen/kWh peak, 47.09 off-peak, before fuel surcharge. An analyst projects about 66.6 sen/kWh effective if a 7.59 sen surcharge applies from Jan 2027 (a projection, not the current rate)The Star
Booked versus used1,374 MW used of 2,346 MW contracted (58.6%). The minister said operators will have to pay for full contracted capacity; no date or rate givenw.media; The Star
Renewables ruleAt least 30% renewable energy for the sector, approved Oct 2026. No effective date; framework still being draftedMalay Mail; w.media